The thermoplastic material is heated either directly from the burner or via thermal transfer oil in a separate chamber heated by the burner.
Learn more here
A rule of thumb indicates the total preheater volume must be minimum four times the tank capacity of the marking machine;
Learn more here
On average, 2 units of Borum preheaters with indirect heating BM ID-1100 (1100 L each) can melt 10000 kg on a 10-hour working day.
Learn more here
The maintenance of the preheaters plays an essential role for both melting capacity and lifetime of the preheaters.
Learn more here
When starting up don't put too much material in and let it melt while being mixed. Put in a few bags at a time and let them melt before adding more material.
Learn more here
You can have just 1 chute, which you attach to the preheater that you are taking the melted material from. For your convenience, you can get 1 chute for each preheater you are using, especially if working with different colours.
Learn more here
It could be that the Cad cell is faulty (no connection or dirty).
Learn more here
it could be because there is water in the heating oil or it could be that there is too much oil in the boiler.
Learn more here
If there is white smoke coming from the chimney, the burning is not correct.
Learn more here
You can get the hydraulic pressure from the PTO and the electric power from the electrical system on the truck (24V).
Learn more here